Today I was supposed to be staying in waiting for the plumber, then the courier taking away my broken graphics card. So I figured I’d catch up on some soldering I’d been meaning to do while they were wrenching apart my bathroom. Turns out the overflow isn’t a big deal, since its got an internal one now instead of an external one, but I’ve now got two shiny new taps and all four in the bathroom work – no more having to check them make sure they really are turned off.
Then just as they were leaving the courier turned up. And I’ve finished my soldering, well, apart from a slight blobbing on one of the IC holders, but I can’t do anything about that until I’ve got a solder sucker, and I need a power supply and some sensible wiresnips. But thats it, I’m now free to go out again, and I hadn’t expected to be able to have a plan this afternoon.
6 comments